We keep our word — open with customers, staff and suppliers alike.
Mission
Better parts for our customers,
dependable dates for their lines.
We count before we promise, and once we promise, we treat it as a commitment.
Vision
Cast parts that stand up to an audit.
Build a plant that keeps its people.
Run a business that outlives us.
People are the most valuable asset here, and what we leave behind is something worth handing over.
Our values
Five words we hire by, review by and pick suppliers by.
Tight control on every part; no shortcuts on material or process.
Safety first on the floor — nobody gets hurt making a part.
Feet on the floor: solve the problem at the machine, not in a meeting.
Staff earn more, customers get what they paid for, the company lasts.
Six rules we work to
Six rules I set: the plant works to them, and customers can check them.
Review the drawing before the price
Shrinkage, machining stock, gating and feeding are settled before a number goes out, so the price matches a process we can actually run.
No batch before first-article sign-off
The first casting is scanned against the model and measured; the batch starts only after it is signed off.
The paperwork travels with the pallet
Material certificate, hardness results and dimensional report ship with the batch — not a week later on request.
Changes in writing, before they happen
Any change to pattern, process, material or subcontractor is put to the customer in writing before it takes effect.
Contain first, explain second
A suspect batch is quarantined and the customer gets a disposition within one working day; the root cause follows once we have it.
Pack for the sea, not for the yard
Packing is designed for the container and the ocean transit — rust protection, bracing, lifting points — not just for our own forklift.
The people behind the castings
Machines can be bought. A moulder who can read a foam pattern, or a pourer who judges a heat by the slag, cannot — those take years to make, and they are why the casting comes out right.
How people get good here
- New starters shadow a qualified hand for three months before working a station alone.
- Skill grades and pay bands per station — moulding, pouring, cleaning, machining, inspection.
- Quarterly in-house technical sessions; the two photos on this page are from one.
- Spectrometer, hardness, CMM and crane operators are trained and authorised in writing.
Safety and environment
Foundries are dirty by default. Ours is a lost-foam plant in a district that has been casting iron for centuries — what keeps it running is environmental performance, not paperwork.
- Discharge permit renewed in April 2026, valid to 2031 — publicly checkable.
- Paint line rebuilt as a sealed booth with exhaust treatment; the upgrade was filed and completed in 2024.
- Dust extraction at the moulding, shake-out and shot-blast stations.
- Named a Green Casting Demonstration Enterprise in 2018.
- Annual safety drills and PPE issue, logged by workshop.
A plant visit beats a web page
Walk the moulding line, open a batch file, talk to the pourer. We will arrange the day around your audit checklist.